Bathroom Renovation in Slough

Slough Decorators provide bathroom renovation decorating in Slough, covering the full decoration scope on bathroom refits in Upton, Chalvey, Cippenham, and across SL1, SL2, and SL3.
- Decoration after full strip-out on new plasterboard and sand-and-cement render
- Moisture-tolerant primer as a standard step before any topcoat
- Sequencing after second-fix plumbing and tiling
- Lime-plaster damp assessment behind removed suites in older properties
Completed bathroom renovation decoration in Upton and Chalvey post-war semis following full strip-out, and in period Burnham properties where original plaster behind removed suites needed assessment before any new system could go on.
Call 01753 303456 for a free quote.
Why Choose Slough Decorators
Strip-Out Surface Specialists
Upton and Chalvey strip-outs expose new plasterboard or sand-and-cement render — each gets the right primer.
Clear Pricing
Fixed price from the first quote, with no unexpected additions.
Fully Insured
Full public liability cover on every bathroom visit across the SL catchment.
Highly Recommended
Most of our work comes from repeat clients and referrals across Slough.
Bathroom Renovation Decorating Services
Slough Decorators handle the decoration scope on full bathroom refits across SL1, SL2, and SL3 — sequenced around the plumber, tiler, and second-fix trades.
Decoration After Full Strip-Out
Bathroom renovations in post-war semis across Slough frequently follow a full strip-out where the original plaster comes away with old tiles. The replacement surface is new plasterboard or sand-and-cement render.
For a straightforward bathroom repaint where existing surfaces are sound, see our interior painting page. For a wider renovation where the bathroom is one of several rooms, see our home renovation page.
Moisture-Tolerant Primer on New Surfaces
The primer stage matters more in a bathroom than in any other room. A standard trade primer applied to new render or plasterboard in a bathroom will absorb moisture at every shower cycle and fail behind the topcoat.
We use a moisture-tolerant primer as a standard step on all bathroom renovation projects, not an upgrade. Where new sand-and-cement render is in place, the primer must also manage alkali content during early cure.
Sequencing After Second-Fix Plumbing and Tiling
Render or plasterboard goes on. The render cures. We apply our sealing coat and primer. After that, the tiler works. After tiling, we return to complete the wall areas above and below the tile line, the ceiling, and any woodwork.
We discuss the programme with you and the trades at the start. Working out of sequence creates rework — paint marking from the tiler, or tile adhesive contaminating a primed surface.
Lime Plaster and Period Properties
Period properties in Burnham and the Stoke Poges fringe sometimes have original lime plaster behind removed bathroom suites. Lime plaster is more absorbent and carries more moisture than modern gypsum.
Lime plaster with active damp behind it must be treated before any decoration. For the wider context of period substrate management, see our period property painting page.
Cure Time on New Render
Tiling contractors often hand over before the render has dried sufficiently. Any decoration work started too soon causes blistering at the first heated shower cycle.
We observe a minimum cure period and verify surface condition before the first coat goes on. We will not prime over a wet surface regardless of scheduling pressure.


Get My Free Quote
Book your free bathroom renovation site visit with Slough Decorators
Here’s How It Works
1. Pre-Strip-Out Visit
Where possible, we visit before the old suite is removed to assess existing wall condition and discuss likely substrate with the plumber and tiler.
2. Post-Strip-Out Surface Check
After the old suite and tiles are out, we assess the exposed surface. New plasterboard, new render, or original plaster — each requires a different approach. We confirm cure timelines before agreeing to start.
3. Sealing Coat and Moisture-Tolerant Primer
New surfaces get a sealing coat followed by a moisture-tolerant primer matched to the specific surface type. We do not proceed until the surface condition is right for primer.
4. Post-Tiling Return
After the tiler finishes, we return to complete the wall areas above and below the tile line, the ceiling, and woodwork — door frame, skirting, and window sill where applicable.
5. Final Walkthrough
We go through the full bathroom with you before leaving. Coverage at the tile perimeter, ceiling junction, and window reveal are all checked. Nothing is signed off until it passes.
Bathroom Renovation Costs in Slough
Costs vary across Slough’s diverse stock; figures below are starting ranges. Call 01753 303456 for a free quote.
A full bathroom renovation in Slough — new suite, tiling, waterproofing, new plasterboard or sand-and-cement render, and full decoration — typically runs from GBP 7,500 to GBP 14,000. The decoration and finishes scope within that typically runs GBP 800 to GBP 1,400.


Surface Condition After Strip-Out
If new plasterboard is being fitted, the primer and sequencing requirements are straightforward. If original lime plaster is exposed with active damp, assessment and remedial work add time before decoration can start.
Bathroom Size
A compact bathroom under 5 square metres in a post-war semi is a shorter decoration programme than a full family bathroom in a Wexham or Burnham detached property.
Return Visit Scheduling
Projects where we return after tiling in a second visit require more programme coordination than a straightforward single-visit repaint. The two-phase approach is standard on full renovations.
Trade Insight
Post-war semi bathrooms across Slough are often compact with limited mechanical extraction. The ventilation constraint means primer choice and topcoat selection both matter more in these small bathrooms.
Typical ranges: bathroom renovation decoration, Upton or Chalvey post-war semi, GBP 800 to GBP 1,100; Wexham executive detached larger room, GBP 1,000 to GBP 1,400; Burnham period property with potential lime plaster assessment, GBP 1,100 to GBP 1,500. Call 01753 303456 to arrange a site visit and written quote.
Areas We Cover
Bathroom renovation decorators across Slough, SL1, SL2, and SL3.
Our bathroom renovation programme covers Burnham, Chalvey, Cippenham, Datchet, Farnham Royal, Iver, Langley, Stoke Poges, Upton, and Wexham. Call 01753 303456 if you are unsure whether we cover your area.
Bathroom Renovation FAQs
Get My Free Quote
Fill in the form below for a free quote:
